ABOUT US


CIMC Modular Building System (CIMC-MBS), a business unit of  CIMC Construction Technology under CIMC Container Group,  has grown into the largest provider of modular buildings and modular building systems in the world, by demonstrating that innovative design and patented building technology could truly alleviate traditional    build constraints via shorter build time.

Since founding in 2004, CIMC-MBS has established and maintained several strategic co-operations with global chain hotels including Hilton, Marriot, Inter Continental, citizenM, senior high-end real estate development company Relevant Group, as well as three major international mining companies including Rio Tinto, BHP Billiton and FMG.

Backed by years of successful project experiences, CIMC-MBS has successfully delivered over 70 projects with over 45,000 rooms to the UK, the USA, Australia, Iceland, Norway, Africa, Japan, China Mainland and Hong Kong.

It has gradually grown from a modular building supplier to a company capable of providing Engineering, Procurement, Construction and Management (EPCM) services including development approval, conceptual design, detailed design, fabrication, logistics, onsite installation, project management and finance services.


CIMC-MBS Scope of Service

CIMC-MBS regards the BOPAS (Buildoffsite Property Assurance Scheme) accreditation as a serious and valuable asset to our business. As such, we have made a commitment to ensure that our product and processes comply fully with the BOPAS criteria. We have always adopted the holistic approach to all our projects, so it is with this philosophy that we look to be provide a full Design, Manufacture and Construction service, aligned with the Build Offsite scheme.

Accreditation to industry-wide schemes is of paramount importance to the entire team at CIMC-MBS. There is a strong commitment and drive from the Senior Management team that filters through all members of CIMC-MBS and our sub-contractors and suppliers, consultants and operatives. Our existing portfolio of global accreditation to recognised schemes is further strengthened by the addition of BOPAS and it is a measure of assurance that we will continually strive to meet.

Region
Project Type
CASES
School
Medical
Emergency Facilities
  • EnPing lsolation Observation Center

    time : 2022

    location : Jiangmen, China

    Temporary Building

    EnPing lsolation Observation Center
    The project adopts the internationally leading CIMC modular building system. CIMC MBS in the role of EPC general contractor integrating the oveerall scheme design, procurement, module manufacturing and on-site civil engineering.
    Construction Floor Area:5,238㎡

    Modules:235

    Storeys:4

    Stage:Completed
  • Jiangmen Centralized Quarantine and Observation Facility

    time : 2021

    location : Jiangmen, China

    Temporary Building

    Jiangmen Centralized Quarantine and Observation Facility
    CIMC MBS team completed the delivery of Jiangmen Centralized Quarantine and Observation Facility in 60 days. The project has created many bests. E.g. Jiangmen’s first large-scale emergency isolation site, the most distinctive Internet-famous location and the largest modular building complex in Jiangmen with the EPC mode built by CIMC MBS. The overall planning and design of the project reflect the CIMC MBS team’s spirit of continuous iteration, continuous optimization, dedication and perfection for quarantine isolation products.
    Construction Floor Area:15,000㎡

    Modules:641

    Storeys:4

    Stage:Completed
  • Jiangmen Jianghai Quarantine Hotel

    time : 2021

    location : Jiangmen, China

    Temporary Building

    Jiangmen Jianghai Quarantine Hotel
    As the second quarantine hotel built by CIMC MBS in 2021, the Jianghai Quarantine Hotel was delivered and put into use within 21 days. The hotel project is located within the Jianghai District Bus Terminal, with a building area of 2000 square meters. The overall layout of the building is butterfly shaped and consists of 78 modular buildings, including 66 single rooms, 10 double rooms, 1 registration room and 1 disinfection and sterilization room. The indoor area of each hotel room is 18 square meters.
    Construction Floor Area: 2,000㎡

    Modules: 78

    Storeys: 2

    Stage: Completed
  • Jiangmen Xinhui Emergency Quarantine Point

    time : 2021

    location : Jiangmen, China

    Temporary Building

    Jiangmen Xinhui Emergency Quarantine Point
    During the 2021 Spring Festival, the emergency isolation facility in Xinhui was delivered and put into use within 28 days. The facility provides up to 262 temporary isolation beds for international travelers. The project is located next to the Bus Terminal in Xinhui District, Jiangmen City, covering an area of approximately 5000 square meters. It consists of 254 modules, including 162 single rooms and 50 double rooms, with a total of 262 beds.
    Construction Floor Area: 5,000㎡

    Modules:254

    Storeys:3

    Stage:Completed
  • Emergency Center Staff Accommodation of The Third People’s Hospital of Shenzhen

    time : 2020

    location : Shenzhen, China

    Permanent Multi-storey Building

    Emergency Center Staff Accommodation of The Third People’s Hospital of Shenzhen
    The apartment building has three floors and 27 modules in total. Each floor has 7 four-bedroom apartments (which can be changed into double rooms or single rooms) and can accommodate up to 84 medical staff. The rooms are equipped with five functional areas, including toilet, shower room, washroom, storage area, independent balcony, etc. Each floor is also equipped with public service supporting facilities such as open leisure area, multi-functional room, water room, laundry room, etc. The construction period is only 20 days, and the installation work is completed on site 24 hours a day, which ultimately ensures that the entire project is completed on time, with high quality and efficiency, and contributes positive forces to help Shenzhen win the battle against the epidemic prevention and control.
    Construction Floor Area:1,296㎡

    Modules:27

    Storeys:3

    Stage:Completed
Data center
Commercial building
Emergency Facilities
  • Caroline Hill Road Community Vaccination Center

    time : 2022

    location : Hong Kong

    Temporary Building

    Caroline Hill Road Community Vaccination Center
    In 2022, in response to the fifth wave of COVID-19 outbreak in Hong Kong, the government urgently needs to build community vaccination centers. Upon receiving the urgent project requirements, CIMC MBS immediately mobilized resources for production and manufacturing, and completed the 15 modules within just one week. CIMC MBS's efficient and high-quality products have gained recognition and praise from customers. The community vaccination center is currently the largest vaccination center within a private property in Hong Kong.
    Modules: 15

    Storeys:1

    Stage:Completed
  • Hong Kong Penny's Bay Phase 5&6 and Kai Tak Community Isolation Facilities

    time : 2022

    location : Hong Kong

    Permanent Multi-storey Building

    Hong Kong Penny's Bay Phase 5&6 and Kai Tak Community Isolation Facilities
    Hong Kong's Penny's Bay Phase 5 & 6 and Kai Tak Community Isolation Center adopted permanent building design standards, fully incorporating several design details such as drainage, sewage, exhaust, etc., and strictly implement the infection control standards and requirements of the Hong Kong Quarantine Center. The "peace and epidemic combination" design can be moved to other places or adjusted to public transitional housing after the epidemic is over, alleviating the housing problem of Hong Kong citizens.
    Construction Floor Area: 41,400㎡

    Modules:2300

    Storeys:2&4

    Stage:Completed
  • Hong Kong Penny's Bay Quarantine Center 3A

    time : 2021

    location : Hong Kong

    Permanent Multi-storey Building

    Hong Kong Penny's Bay Quarantine Center 3A
    CIMC MBS achieves delivery of 901 isolation room modules in 2 months. The project can not only meet the short-term emergency needs, according to the plan of the Hong Kong SAR government, by the end of the COVID-19, the project module will be moved to other areas designated by the government after comprehensive disinfection and sterilization, and combined into a 4-storey public transitional housing to continue serving Hong Kong citizens.
    Construction Floor Area: 17,000㎡

    Modules:901

    Rooms: 881

    Stage:Completed
  • Hong Kong Pak Heung Temporary quarantine facilities

    time : 2020

    location : Hong Kong

    Permanent Multi-storey Building

    Hong Kong Pak Heung Temporary quarantine facilities
    The Hong Kong SAR government aims to establish more quarantine centers for the coronavirus epidemic, and the Pat Heung Youth Police Call Center is used as a temporary quarantine residence. This project is one of the three mandatory quarantine projects constructed by the Architectural Services Department (ASD) in Hong Kong. It's built using modular construction, with CIMC-MBS providing 120 single modular units.
    Construction Floor Area: 1,800㎡

    Modules: 120

    Storeys: 2

    Stage: Completed
Public Housing
Commercial & Office
Apartment
Apartment
Hotel
Student Accommodation
Hotel
  • citizenM Menlo Park Hotel

    time : 2023

    location : California, US

    Permanent Multi-storey Building

    citizenM Menlo Park Hotel
    CIMC MBS and the internationally renowned "affordable luxury" hotel brand citizenM have joined hands again to build a Silicon Valley landmark hotel at the Facebook headquarters campus. The hotel has 5 floors, 161 modules and 240 guest rooms.
    Construction Floor Area:5,800㎡

    Modules:161

    Storeys:5

    Stage:Completed
  • CitizenM DTLA Hotel

    time : 2020

    location : Los Angeles, US

    Permanent Multi-storey Building

    CitizenM DTLA Hotel
    The citizenM DTLA Hotel is located in downtown Los Angeles, with a total of 315 hotel rooms. There are 11 floors with total floor height of 130 feet (approximately 40 meters). The ground floor open areas are formed using an in situ steel transfer frame which supports the 238 fully fitted out modular units on floors 2 to 11. As the first hotel project in the United States constructed by CIMC MBS, citizenM DTLA also marks the first successful application of steel structure modular buildings for high rise hotel buildings in the USA, writing a new chapter of brilliance for the global modular industry!
    Construction Floor Area: 7,225㎡

    Modules:238

    Rooms:325

    Storeys:11

    Stage:Completed



Student Accommodation
Hotel
Hotel
Hotel
Student Accommodation
Workforce accommodation
Student Accommodation
Hotel
Return